Bridge Out on CR299 Again- 2nd time in 2 weeks

Water cut road base

Water cut road base

Water flowing over road, cut road base about 1 foot

Water flowing over road, cut road base about 1 foot

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *